Valley Range Battery Storage: 62.5 MW and 250 MWh
Valley Range battery storage is pitched as a 62.5 MW battery. Records shared with the co-ops and filed with the county also say 250 MWh.
11/28/20262 min read


Valley Range battery storage is described with two different units in the public documents, and they are easy to mix up. This page explains the three numbers and shows where each one appears.
Three numbers, three jobs
125 MW: the solar output. The solar panels are rated at 125 megawatts AC.
62.5 MW: the battery's power. This is how fast the battery can send electricity out at once.
250 MWh: the battery's stored energy. This is how much electricity it can hold. The emergency plan describes "4-hours of discharge duration," and 62.5 MW × 4 hours = 250 MWh.
A simple comparison: megawatts are like the size of a water faucet, and megawatt-hours are like the size of the tank behind it.
Valley Range battery storage: where each number appears
250 MWh appears in the application and in the developer's own materials:
Attachment 21, Dust Control Plan, PDF p. 4: "BESS capacity of 62.5 MW, 250 MWh."
Attachment 01, Economic Impact Analysis, PDF p. 20: "62.5 MW/250 MWh BESS."
A June 2026 project summary prepared for the cooperatives: "62.5 MW BESS (250 MWh)" (EEA records, p. 000364).
The "Local Benefits Summary" on valleyrangeep.com: a "62.5-megawatt (MW)/250-megawatt-hour (MWh) Battery Energy Storage System."
Only 62.5 MW appears in the public summaries:
The valleyrangeep.com homepage: "a 62.5MW battery energy storage system."
The project one-pager: "62.5 MWac Battery Energy Storage System."
Empire Electric Association's October 5, 2026 press release and September 2026 fact sheet: "62.5MW."
None of these summaries gives a megawatt-hour figure. The documents above do.
Why the difference matters
Fire and emergency planning for a battery depends on how much energy is stored, not only on how fast it discharges. The draft Emergency Response Plan (Att. 18) gives the 62.5 MW rating and four hours, but its fire-water tank, flow rate and duration are listed as "[TBD]." The plan does not state the 250 MWh figure. Read more in the fire plan article →
Questions to consider asking on the record
Is 250 MWh the capacity the county is being asked to permit?
Will the final fire-water supply, gas monitoring and emergency plan be sized to that figure?
Why do the public summaries give 62.5 MW without the megawatt-hour figure?
Sources
Application Att. 21, Dust Control Plan (p. 4): https://co-montezuma-co.smartgovcommunity.com/Blob/ef696045-e445-4cc2-b95b-b5080054b431
Application Att. 01, Economic Impact Analysis (pp. 6, 20): https://co-montezuma-co.smartgovcommunity.com/Blob/4ddcbeef-96f4-4526-807c-b5080050a8c9
Application Att. 18, Draft Emergency Response Plan (printed p. 6): https://co-montezuma-co.smartgovcommunity.com/Blob/3c62249c-3402-413c-b7f4-b508005471f8
EEA records, p. 000364 ("Valley Range Energy Park – Project Summary, June 2026"). Document obtained through a records request; not linked here.
Valley Range Energy Park, Local Benefits Summary (PDF): https://cdn.prod.website-files.com/678c73ee6d63024ee90dfe57/6aa1669a0892acfaacda3876_Valley%20Range%20Energy%20Park%20-%20Local%20Benefits%20Summary.pdf
Valley Range Energy Park, homepage: https://valleyrangeep.com/ and one-pager: https://cdn.prod.website-files.com/678c73ee6d63024ee90dfe57/6a10a886913974728d1a7b27_AccelergenOne-Pager_ValleyRange_V14.pdf
Empire Electric Association press release, Oct. 5, 2026: https://www.eea.coop/sites/default/files/2026_10_05_EEA_Valley_Range_Press_Release.pdf and fact sheet, Sept. 2026: https://www.eea.coop/sites/default/files/2026_09_30_EEA__VREP_Fact_Sheet.pdf
This site collects public records so residents can read them for themselves. Corrections welcome.